Summer Knitting in Winter

The not so new job is still keeping me very busy. So much so that it was really starting to be Fall before I started my summer knitting. And I’m thinking, it is this sort of thing that creates so many UFOs. You scheme and plan and get things gathered and before you know it *POOF* Summer is gone.

I managed in September to whip up a Sleeveless Mock Turtleneck Tube Vest by Stefanie Japel in a dreamy Bernat Panama Natural Flax (AKA oatmeal) color from some of grandma’s stash. So yes, I’m still “shopping” mostly from home, but that hasn’t stopped the buying new yarns. :-/

img_5284

It took two tries. The one I made in August was HUGE due to a brain fart I had on sizing. I swatched and fixed the gauge with the different yarn, but somehow I thought what stitches per side was just the stitches for the center pattern. Needless to say I was off by several inches (12 stitches each side of the center stockinette panel).

Try 2 in September was a winner, but it was already getting a bit to chilly to wear it. Don’t be fooled by the photos–it was a cool breezy day and my jacket was close at hand.

And what of the Smitten Tee I was planning to do next? *sigh*

Well, I cast it on with another grandma stash yarn, Lane Borgesesia, Cotone del Borgo in navy, when it was still warmish, but then I started to feel the pressure of Christmas knitting. So now after working so hard last year to punt UFOs and getting down to a project or two in progress. Smitten, is now firmly on my “to-do” list.

img_5386

Anyone else run out of time to finish their summer knitting plans? Did you carry on, frog or just tuck it away?